BESS4 is the NSW Peak Demand Reduction Scheme activity supporting eligible battery installations at small and medium business premises.
Commercial battery storage for eligible NSW businesses, assessed around your energy needs.
| BESS4 | Over 20 kWh | Up to 200 kWh | NSW Businesses | Site Assessment |
|---|---|---|---|---|
| Business battery incentive | Minimum usable capacity threshold | Maximum usable capacity | Eligible non-residential premises | Eligibility and system suitability |
Store available energy and use it when your business needs it most. Commercial batteries can help increase solar self-consumption, manage electricity costs and reduce peak grid demand when appropriately sized and configured.
Fortune Solar can assess your consumption, existing solar, electrical infrastructure and proposed installation to help you understand suitable battery options and potential BESS4 eligibility.
Start with your electricity consumption and site conditions to identify storage that serves a clear purpose.
Understand the proposed equipment, electrical work and commissioning requirements before making your decision.
Assess battery and inverter configurations suited to your premises, energy demand and existing solar infrastructure.
Review system pricing, potential incentives and your contribution in a proposal with clearly explained assumptions.
Your business may benefit from adding storage to existing commercial solar or installing new generation alongside a battery. The appropriate configuration depends on how much energy you use, when you use it and the infrastructure already on site.
| Battery Added to Existing Solar | New Solar and Battery Installation |
|---|---|
| Review existing solar generation and exports | Assess generation and storage together |
| Check inverter and electrical compatibility | Select compatible solar, battery and inverter equipment |
| Size storage around useful surplus energy and demand | Balance solar output with operating hours and consumption |
| Assess battery installation incentive eligibility | Assess eligibility for the new-solar incentive configuration |
Installation costs depend on equipment, switchboard requirements, cabling, access and system design. Request a complete installed-system proposal to understand the project cost.
Store available surplus generation for later business use. This can be useful where your premises export electricity during the day but continue buying power after solar production falls.
A battery can shift electricity use away from more expensive tariff periods. The opportunity depends on your electricity contract, charging strategy, system losses and daily consumption pattern.
Where your tariff includes demand charges, a suitably designed battery may help limit peak grid imports. Battery power, controls and the timing of your largest loads all matter.
Choose equipment and placement that suit your available space, electrical supply and site conditions. Installation access, clearances and switchboard capacity should be considered early.
New equipment, longer operating hours or future electrification may change your energy profile. Assess these plans during system design, with any future expansion subject to equipment compatibility and installation requirements.
A commercial battery should solve a specific energy problem. That may be using surplus solar after closing time, supporting evening trading or managing short periods of high electricity demand.
Start by understanding your electricity use throughout the day. A monthly bill shows total consumption, but interval data can reveal when your business draws the most power and whether those periods overlap with solar production.
Storage capacity and battery power also need to be considered separately. Capacity determines how much energy can be stored, while power determines how quickly that energy can be delivered. A large battery with insufficient discharge power may not support the loads you want to manage.
For businesses with existing solar, available surplus generation is another important factor. If most solar electricity is already used during the day, there may be less energy available to charge a battery. Additional solar could be worth assessing where the roof, electrical infrastructure and business case support it.
Fortune Solar can review these factors together to develop a proposal that explains the recommended configuration, installation scope and expected operating benefits. Potential incentives form part of that assessment, alongside the system’s practical value to your business.
The right size depends on your consumption, solar exports, operating hours and the loads you want to support. Offices, hospitality venues, retailers and workshops can have very different storage needs, even when their total electricity bills look similar.
Review when your business imports electricity and how much surplus solar is available. Then compare the energy you want to shift with the battery power needed to serve those loads.
Fortune Solar can assess bills or interval data, solar production, inverter compatibility, phase supply, switchboard condition and available installation space. This helps identify useful storage capacity without assuming the largest system is the best investment.
BESS4 operates through the NSW Peak Demand Reduction Scheme. Accredited Certificate Providers create Peak Reduction Certificates for qualifying installations, helping fund a discount through participating installers. The agreed incentive should be identified in your quote. BESS4 requires a minimum customer payment of $5,000 per implementation; this is a contribution requirement, not an incentive amount.
BESS4 covers qualifying non-residential business installations with combined usable battery capacity greater than 20 kWh and no more than 200 kWh. Residential buildings and data centres are excluded.
Equipment must meet scheme requirements, including approved battery listing, relevant inverter and warranty conditions, and installation by an appropriately SAA-accredited installer. Required planning and network approvals must also be obtained.
Eligibility checks include grid connection and previous use of the business battery discount. Battery capacity alone does not establish eligibility.
BESS4 is the NSW Peak Demand Reduction Scheme activity supporting eligible battery installations at small and medium business premises.
It may reduce grid imports or help manage tariff costs. Results depend on consumption timing, charging opportunities, electricity rates, system losses and installed cost.
Only a compatible system designed with backup capability can support agreed loads during an outage. Available power and runtime depend on equipment, stored charge and demand.
Potentially. Your solar generation, inverter configuration, electrical supply and site infrastructure need to be assessed for compatibility.
Battery-only installations may qualify. Eligible new or additional solar installed within 90 days of the battery can attract a larger discount, subject to sizing requirements.
Combined usable battery capacity must be greater than 20 kWh and up to 200 kWh, alongside the other eligibility requirements.
Costs vary with battery quantity, inverter equipment, switchboard work, cabling, access and installation complexity. A site-specific quote should explain the equipment, incentive and total customer cost.
Work with a participating installer and complete the required nomination paperwork before installation. Eligibility and the proposed discount should be confirmed during quoting.






















Harness Renewable Energy and Reduce Carbon Footprint